professional fees

button_block_feesHow are our fees determined?

tecDESIGN los angeles works on a flat fee basis, determined as a percentage of the construction cost. the construction cost is being determined on the basis of square feet or square meters multiplied with a specific money factor of comparable projects in the area,  Рor on the clients budget. country specific adjustments may apply based on the country specific construction cost factor. our fees are typically at or under 50% of the total architecture fee, as determined above. the percentage depends on which design services the client needs. the local executive architect is typically hired by the client on a separate contract. if tecDESIGN is being hired by a local architecture firm as a design partner, this firm becomes our client.